COST ENGINEERS AND ESTIMATORS

Keep the estimate and the forecast telling the same story.

The estimate, the budget and the forecast are built at different times by different people. Differences hide until the report is issued.

Ask
Compare the approved estimate with the control budget and list the differences.
Lines that differ, by how much, and likely cause.
TODAY
  • Estimate and budget are compared by hand.
  • Quantity and rate changes are not traced to cost.
  • Contingency draw is tracked in a side sheet.

Workflows to start with.

Compare estimate to budget

Compare the approved estimate with the control budget and list the differences.

You get: Lines that differ, by how much, and likely cause.

Trace a rate change

What changed in the unit rate for structural steel since the bid?

You get: The rate history with the quote or PO behind each step.

Track contingency

Show contingency drawn this period and the risks it covered.

You get: A draw-down table linked to the risk register.

See it on your own cost report.